Year
2010
File Attachment
Abstract
Background After the terrorist attacks from 11th September 2001 Accident scenarios exceeding the design requirements, e.g. Forced aircraft crash Corresponding analysis have been executed with regard to the assessment of the inherent safety in an interim NSF storage facility