Year
2008
Abstract
Joint efforts by the Electrochemical Plant (ECP) in Zelenogorsk, Russia, and the United States Department of Energy National Nuclear Security Administration (US DOE/NNSA) Material Protection, Control and Accounting (MPC&A) Program to upgrade ECP security systems began in 1996. The commissioning of major MPC&A systems at ECP occurred in December 2004. Since that time, the US Project Team (USPT) and ECP personnel have focused jointly on the development and implementation of an enterprise-wide MPC&A Sustainability Program (SP) that address the seven essential MPC&A Program sustainability elements. This paper describes current operational experience at the ECP with the full implementation of the site SP utilizing an earned-value methodology. In support of this site program, ECP has established a Document Control Program (DCP) for sustainability-related documents; developed a robust master Work Breakdown Structure (WBS) that outlines all ECP MPC&A sustainability activities; and chartered an Enterprise- Wide Sustainability Working Group (ESWG) The earned value methodology uses ECPcompleted (and USPT-verified) analyses to assess project performance on a quarterly basis. The MPC&A SP, presently operational through a contract between ECP and the Los Alamos National Laboratory (LANL), incorporates the seven essential MPC&A Program sustainability elements and governs all sustainability activities associated with MPC&A systems at ECP. The site SP is designed to ensure over the near term the upgraded MPC&A systems continuous operation at ECP as funding transitions from USassisted to fully Russian supported and sustained.